Woodbine Avenue Road Reconstruction
MEMME delivered the full widening and reconstruction of Woodbine Avenue, including cut/fill, fine grading, and complex underground servicing. The project featured 7.5 km of 750 mm CPP watermain, 8.2 km of storm sewer (300-1,650 mm in diameter) with 18 oil/grit separators, and 12 km of twin sanitary forcemain.
We also installed 2 km of 450 mm diameter forcemain installed using directional drilling—part of 3.2 km total drilled HDPE and CPP forcemains (450-650 mm)—and completed multiple live watermain connections while managing traffic flow in a high-congestion corridor.
Facing high water tables and excess groundwater, our team executed a comprehensive dewatering plan, adhering to environmental approvals, permits, and the Fisheries Act throughout construction.