Memme overcame many staging and execution challenges throughout the West Thornhill Phase 3 project in a residential area. The work included 1.6 km of storm sewer replacement (300-1350 mm), 1.7 km of watermain replacement (150-300 mm), and the installation of a temporary watermain installed during construction.

We completed 18,000 m² of full road reconstruction, including excavation, grading, sub-base, asphalt, curbs, and sidewalks. A key highlight was the installation of an 1800 x 3000 mm storm manhole within a 2.9 m box culvert at 6 m depth, requiring flow bypassing and a detailed traffic management plan, as the work took place in the center of an active roadway.

Memme developed a baseline schedule before construction and provided ongoing monthly updates, tracking project progress and costs. We also communicated with residents to ensure temporary water supply was installed with minimal disruption.