Victoria Park & Lawrence Basement Flooding
The Victoria Park and Lawrence Basement Flooding project was completed in a highly populated residential subdivision, placing restrictions on working hours and production. The project consisted of 3.6 km of storm sewer (up to 1200 mm in diameter), 1 km of box culvert up to 5.5 m wide by 3.1 m high, 0.8 km of 250 mm PVC sanitary sewer and 0.7 km of 150 mm watermain that was in conflict with the proposed storm sewer. The project was completed with full restoration of all impacted areas including sidewalk, curb, asphalt roadway and roadway light painting.
Memme identified conflicts with the proposed box culvert alignment during pre-construction, allowing time for a redesign of some sections before any ground was broken. This proactive approach helped keep the project on time and on budget.
Memme installed the 5.1 m wide box culvert at depths of up to 7 m in a small residential street. Unable to use traditional trench shoring for the installation, Memme worked with the team to design a custom Sliderail shoring system for installation.