Port Credit
MEMME successfully delivered the Port Credit West Village Servicing project under tight timelines in a busy urban corridor. The scope included 3.5 km of storm sewer installation with large 3.6 x 1.2 m box culverts, 3.4 km of deep sanitary sewer installed at depths of up to 6 metres, and 3.1 km of watermain. Two 7 x 4 m storm outfall headwalls were constructed in Lake Ontario, requiring the installation and maintenance of multi-tiered cofferdams and continuous dewatering to manage fluctuating lake levels.
To meet project milestones, MEMME deployed up to four servicing crews, maintained a dual bypass system during deep sanitary installations, and provided ongoing traffic management and schedule tracking. The project also included 4 km of full road construction—complete with new granular subbase, curb, sidewalk, asphalt, and line painting—and 4 km of 1.8 m x 2.2 m precast LID soil cell infiltration trenches, recognized as the largest LID installation in Canada.
Throughout the project, MEMME worked closely with the City of Mississauga, Peel Region, local residents, the Mississaugas of the Credit First Nation, two schools, a nearby firehall, and the local heritage district to ensure timely, coordinated delivery in a sensitive, high-profile area.