Derrydown Basement Flooding

Memme successfully delivered the Derrydown Basement Flooding project despite complex staging and execution challenges in a densely populated residential area. With strict limitations on working hours, our team installed 4.9 km of storm sewer (up to 1650 mm in diameter), 1.6 km of new watermain (150 mm and 300 mm), and decommissioned the existing watermain. All impacted roads were fully reconstructed.

We worked closely with City staff and an arborist to protect sensitive areas and completed full surface restoration including sidewalks, curbs, boulevard sodding, asphalt, signage, and line painting. At the request of local residents, we also extended restoration work beyond the original project limits in coordination with the City councillor.

To install the storm sewer outlet at Black Creek, we constructed a coffer dam to temporarily hold back water, and coordinated with Enbridge to remove and reinstall a section of gas main.

With three school drop-off zones and two TTC routes in the area, Memme collaborated with school administrators and TTC staff to ensure uninterrupted access and transit service. Construction was completed on schedule.

GALLERY