Burnhamthorpe Water Project
Memme completed the Burnhamthorpe Water Project Contracts 1 and 2 by installing 2.5 km of concrete pressure pipe (CPP) watermain (400 mm to 1500 mm in diameter) and 20 large valve chambers (up to 4 metres x 5.5 metres). The project also consisted of 0.2 km of sanitary sewer up to 750 mm in diameter installed at depths of 8 metres.
To minimize traffic disruptions, we implemented a detailed traffic control and staging plan, prepared monthly construction schedules, and coordinated quarterly Primavera schedule updates with the General Contractor and this-party consultant.
Working closely with Peel Region operations, Memme overcame challenges like restricted working hours and numerous unknown underground utilities, which required multiple design adjustments to the watermain.