BDC Lowes
Memme completed sanitary, storm, and watermain servicing for an industrial building in Milton. The scope included 3.4 km of storm sewer (300-1500 mm), 0.9 km of 300 mm sanitary sewer, 3.5 km of 300-400 mm watermain, and 300 m of 400 mm CPP watermain. We also installed a 150 mm, 0.4 km temporary forcemain with an 8 m deep pumping station, along with three infiltration pits providing over 3,000 m³ of stormwater storage.
Key features included a 4×6 m pressure-reducing valve chamber, a 28 m long O-Series precast concrete culvert with 83 m of retaining wall, and a live watercourse bypass using a temporary flume.
Faced with a tight timeline, Memme completed the temporary sanitary pumping station—including basin, pumps, piping, electrical, and commissioning—to enable building occupancy ahead of the Derry Road sanitary connection. When the Region of Halton requested all public ROW watermain be upgraded to CPP mid-project, Memme quickly secured materials through strong supplier relationships to procure the pipe within a month of the request.