411 Victoria Park
The 411 Victoria Park project included complete subdivision servicing and road reconstruction, with over 3 km of storm, sanitary, and watermain installation. This included 700 m of 250 mm sanitary sewer, 1,000 m of storm sewer (300–825 mm), 400 m of 3.0 m x 1.8 m box culvert, and 1,000 m of watermain (200–300 mm), with four connections completed via tapping sleeve and valve. MEMME also rehabilitated 530 m of 10 m deep 1050 mm and 1350 mm brick sewer using CIPP lining and installed three new manholes with major sanitary bypassing.
All roadworks were completed within existing rights-of-way, including granulars, subdrains, curb, sidewalk, and asphalt. MEMME completed earthworks across the 35-acre site, bringing development blocks to final elevation and managing PSS disposal in compliance with Ontario Regulation 406/19.
The project also included construction of a 600 m crash berm along the Metrolinx corridor, requiring daily coordination and permit approvals, installation of a 40 ft berm along the CN rail line, and placement of several OGS units, 150 m of Silva Cells, and upgraded traffic signalization and line painting on Victoria Park. A baseline schedule was developed prior to construction, with regular biweekly updates throughout.